jizz中国老师高潮喷水,国产av在线观看,玩弄人妻少妇500系列,99国精产品一区二区三区a片

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Usage and installation steps of hydraulic lifting platform

Source: Time:2020-03-14 09:02:33 views:

Usage and installation steps of hydraulic lifting platform

The usage method and installation steps of the 1137 hydraulic lifting platform. There are many details to pay attention to when using the hydraulic lifting platform. The following mainly discusses the installation steps of the hydraulic lifting platform:

1、 Compilation basis: Based on the user manual of the guide rail elevator, construction organization design, and on-site geological conditions.

2、 Preparation work before construction: (1) Inspect the work site for pits, ditches, hidden ditches, and holes, and check for high-voltage and communication lines above. If the above phenomena occur, take support measures. (2) Check for any obstacles on the entrance and exit roads. (3) The tools, toolboxes, rigging, rope buckles, safety helmets, safety belts, and other items used by various trades participating in the installation and dismantling of elevators (c ā n ji ā) shall be transported to the work site for backup.

3、 Foundation: The aluminum (Al) alloy elevator foundation has been processed by the civil construction unit (ch ǔ l ǐ).

4、 Basic requirements for safe operation: (1) Personnel involved in installation and dismantling must be familiar with the mechanical performance and structural characteristics of the elevator, and possess proficient operation and control techniques as well as the ability to troubleshoot general faults. (2) The workers involved in this work should have clear division of labor, each responsible for their own duties, with one person designated to direct the work and establish communication signals. (3) Adhere to all disciplines established to ensure safe production, carry complete safety equipment, and ensure that personnel working at heights meet the relevant regulations of the labor department. It is strictly prohibited to work under the influence of alcohol. (4) In the event of snow, rain, heavy fog, or weather with wind speeds exceeding 13 meters per second, this operation shall not be carried out. (5) The transformer power grid at the construction site shall have a transformer capacity of not less than 100KVA.

5、 Inspection after installation: (1) Recheck whether each fastening point meets the requirements, and tighten if there is any looseness. (2) Check if all components are complete and in effective condition.

6、 Installation completed:

(1) The trial operation of the crane includes trial operation, static load test, and dynamic load operation. Before the previous step is qualified, the next step of trial operation cannot be carried out. ?

(2) Clean the tools, rigging, equipment (sh è b è i), and debris on the construction site.

(3) Personnel and equipment exit the site.

{10}

Links

孕妇高潮xxxxx孕妇| 看同性男aa片| 两女女百合互慰av赤裸无遮挡| 最近免费韩国高清在线观看视频| 双腿张开被9个男人调教| 国产麻豆精东果冻乌鸦传媒| 亚洲女人被黑人巨大进入| 日韩人妻无码一区二区三区| 无码粉嫩虎白一线天在线观看| 中学生广播体操舞动青春| 天天干天天射天天操| 漂亮少妇高潮a片xxxx| 日本sm/羞辱/调教/捆绑视频| 日本丰满白嫩bbwbbw| 老太bbw搡bbbb搡bbbb| 一区二区三区毛a片特级| 少妇bbwbbw性生话| 漂亮少妇高潮a片xxxx| 用舌头去添女人下面视频| 久久久无码精品亚洲日韩按摩| 乱肉合集(二)| 无码精品a∨在线观看中文| 久久精品国产一区二区三区| 久久变态刺激另类sm| 毛片免费看| 色狠狠一区二区三区香蕉| 两根大肉大捧一进一出好爽视频| 精品国产乱码久久久久久1区2区| 亚洲精品一区二区三区四区五区| 白领人妻系列第26部分阅读| 女人被狂躁c到高潮视频| 丰满少妇被猛烈进入a片| 免费在线观看成人电影| 性裸交a片a∨天传媒公司| 黑人粗大无码AV人妻一区| 警察被两个混混脱裤玩j视频| 夜夜嗨av一区二区三区| 无码国产伦一区二区三区视频| 萌白酱jk制服透明白丝| 张柏芝私密的毛无遮挡| 少妇大叫太大太粗太爽了a片小说|