jizz中国老师高潮喷水,国产av在线观看,玩弄人妻少妇500系列,99国精产品一区二区三区a片

Welcome to Jinan Jinli Hydraulic Machinery Co., Ltd! Our company is insured by an insurance company!                              TEL:0531-84233822   TEL:13954115865   中文版

contact us

聯(lián)系我們

TEL:0531-84233822

TEL:15550068833/13954115865

E-mail:jinliyeya@126.com

Address: Haichuang Industrial Park, Huanghe Street, Jiyang District, Jinan City

Company News

Analysis of Interference Issues in the Lifting Platform System

Source: Time:2020-02-25 09:02:28 views:

Analysis of Interference Issues in the Lifting Platform System

The lifting platform plays a key role in construction projects, capable of transporting raw materials and construction teams between roads and buildings. This stipulates that the various components of the lifting platform controller are highly reliable and reliable, especially the main control chip microcomputer system. The DC contactor and AC motor themselves are strong interference signals, and the safety regulations for construction machinery and equipment are relatively high. The leveling control board of the lifting platform works outdoors in harsh environments with many interference signals. The system is designed by a microcontroller to operate the DC contactor based on the intermediate relay, thereby controlling the three-phase AC motor. Therefore, how to deal with the impact of the system is crucial.

There are many factors that make the lifting platform system unreliable, such as metalized holes and loose connectors (loose wiring), which can cause the system to be intermittent; Internal and external influences, excessive harmonic distortion index of switching power supplies, and excessive load on components lead to unstable logic levels; In addition, unscientific wiring and reasonable layout can also lead to poor system reliability.

Based on the reliability performance of the lifting platform, the following criteria are calculated:

1. Specific applications must consider various influencing factors, including natural environment, ground, fork shaking, and compressive strength of supporting legs. Although the critical load in many areas has already exceeded the rated load in the calculation, it is still necessary to consider within the rated load range and prohibit overloading when applying, so as to ensure work safety.

2. Whether from the side or in the forward direction, the working condition of the support leg is not stable without opening it, and it is prohibited to use it. However, opening the support leg can further improve the reliability of work collapse. In specific work, if the standard allows, the support leg should be opened as much as possible. If the support leg is not used in a unique situation, the working angle cannot exceed 5 degrees.

3. When the support leg is turned on and the rated load is 300kg, at a working height of 8m, the side working angle can exceed 15 degrees, and the forward working angle can also exceed 15 degrees. If the support leg is not opened and the working height is 8m under a rated load of 300kg, the forward working angle will only exceed 5 degrees. Otherwise, application is strictly prohibited.

4. The operation of lifting platforms and general engineering machinery equipment have mutual differences, but also their diversity. The development of leveling control boards involves mechanical equipment, hardware and software design solutions. Especially in the hardware and software design scheme, anti-interference design scheme should be fully considered from the beginning. Only in the subsequent on-site adjustment and product development design can the reliability of system operation be improved and the repair rate be reduced.

Summary: With the increasing precision requirements of customers for lifting platforms, their automation technology, intelligent systems, and personalized levels will eventually become higher and higher. Anti interference design schemes will also become increasingly critical. Therefore, fully considering all influencing factors and scientifically researching design schemes for lifting platforms is another reflection of technological progress towards perfection.

{8}

Links

教官脔到她哭h粗话h好爽视频| 日韩精品一区二区三区四区蜜桃| 久久丫精品国产亚洲av不卡| 重口老太大和小伙乱| 少妇洁白无删减版178章| 少年阿宾1一72全文目录| 日本理伦片午夜理伦片| 秋霞影视欧美高清av片| 777午夜精品久久av蜜桃小说| 欢乐颂3电视剧全集免费观看| 亚洲av午夜成人片精品网站| 久久久久99精品成人片三人毛片| 性久久久久久久| 国产69久久精品成人看| 亚洲精品99久久久久中文字幕| 又粗又爽高潮午夜免费视频| 大炕上大战白胖老妇| 中国体育生gary飞机| 免费av一区二区三区| 少妇又紧又色又爽又刺激视频| 掀开奶罩边躁狠狠躁学生| 国产猛男gaygayxxgv| 爽欲亲伦96部分阅读| 老汉噗嗤一声整根全进视频| 极品少妇xxxx精品少妇偷拍| 国产精品高潮呻吟av久久96| 亚洲熟女乱综合一区二区| 体育生gay白袜调教video| 办公室里呻吟的丰满老师电影| gogogo日本免费观看| 欧美jizz18性欧美| 色欲av精品一区二区三区| 小sao货水好多真紧h无码视频| vpswindows另类极品| 无码精品国产av在线观看| 在熟睡夫面前侵犯我在线播放| 浪荡货老子大吗爽死你h漫画男男| 欧美成人在线视频| 在线二区 中文 无码| 古代禁伦h肉全文| 国产亚洲精品麻豆一区二区|